THRUST AREA - 3      Standards & Labelling Programme - Distribution Transformers
Chronology Of Events
S.Ramaswamy, Thrust Area Manager
31st July 2003
Completion Date Activity Progress

March 2003

Setting up institutional mechanism for administration of standards and labelling programme

Steering committees comprising of Manufacturers, Research & Development Institutions, Manufacturers Association, Consumers, Test Laboratories and BEE set up to Guide implementation of BEE S & L Programme.

(Click here for Steering Committee members)

(Click here for first Steering Committee minutes)

(Click here for second Steering Committee minutes)

Technical Committee set up to finalise technical parameters for labeling and star rating plan and testing procedure & protocol.

(Click here for Technical Committee members)

December 2003

Situation analysis to assess existing voluntary standards and labelling programme of Bureau of Indian Standards

(1) Determination Analysis report
(2) BEE-Steering Analysis
(3) Annexures

January 2004

Notifying distribution transformers as notified equipment and appliances

The Ministry had recommended that the notification process would be concurrent with notification of labels, standards. Launch date of label is Jan 2004.

June 2003

Test Procedure and protocol for testing

The technical committee have identified the parameters for energy performance testing and have adopted the IS test procedure with minor modifications. Sampling and other protocols have also been drafted.

Minutes of TC – I     (Click here for MoM)

Minutes of TC – II   (Click here for MoM)

Minutes of TC – III  (Click here for MoM)

Minutes of TC – IV (Click here for MoM)

June 2003

Selection of Laboratories for conduct of testing as per the agreed test procedure.

NABL approved laboratories identified. CPRI & ERDA identified for testing.

Specification of mobile test laboratories frozen. (Click here for Document)

December 2003

Conduct of testing for determining energy performance of different models

ERDA and CPRI have been identified. Utilities to acquire mobile test units and get accreditation.  The testing would start in the month of October 2003.

June 2003

 Enforcement Mechanism

Enforcement mechanism in the form of check testing and challenge testing protocols has been developed. (Click here for Document)

November 2003

Preparation of consumer awareness and education programme

This activity is linked to testing. Consumer awareness programme study would be commissioned in August 2003.

January 2004

Launching of labels

This activity is linked to testing. Labels would be launched by January 2004.

January 2004

Commissioning of engineering economic-market study for fixing minimum energy performance standards

Study commissioned and likely to be completed by January 2004.

June 2004

Development of minimum energy performance standards

Recommendation for improving minimum standards prepared by January 2004 and notified by June 2004.

You are requested to send your comments/observations to Mr. S.Ramaswamy, Thrust area Manager at ramaswamy@bee-india.com

 


 